Knowledge Base

How much are wastewater collection system analysis and lift station analysis fees?

In any subdivision plan consisting of three (3) or more lots within such subdivision, the Wastewater Department shall require the Owner or Developer of such subdivision to apply for and have performed a Wastewater Collection System Analysis. Application shall be made to the Wastewater Department together with a fee of $400.00.
Updated 8/12/2016 11:20 AM
Was this page helpful? Yes No
Thanks for your feedback!